Featured
The Buyer Advantage
Kensington
Services

Contract-to-close management in Kensington

As of 2026, a building permit violation in the Town of Kensington is a Class A infraction with a $520 fine. Kensington closings check permits early.
★★★★★ Average of 5.0 Stars on Google
The Service

Contract-to-close management

Contract-to-close management guards the six weeks where deals actually die: inspection negotiations, appraisal gaps, lender milestones, title issues, and a calendar of hard deadlines that don’t forgive drift.

Moving from contract to closing in Kensington includes a permit check few buyers anticipate. Inside the town limits, building without a town permit counts as a Class A municipal infraction, fined $520 for a first offense and the same for repeats. Decks, fences, driveways, sheds and additions all qualify. If unpermitted work surfaces after settlement, the buyer owns the problem. We ask for permit history right after ratification.

Two clocks run in parallel. Montgomery County requires radon testing on single-family houses and townhouses within the year before settlement, and both parties see the results. Under Maryland law, a buyer who gets the seller’s disclosure after signing has 5 days to rescind. Handing that form over before signatures removes the risk, so we confirm the buyer has it first.

Bill lines need settling as well. Town parcels carried an $87.17 solid waste charge on levy year 2025 bills, compared with $671.39 for most parcels in 20895 beyond the town line. Prorations should use the right figure. Some older properties also carry a WSSC Water front foot benefit charge. It can remain on the tax bill for as long as 30 years, though an early payoff is allowed. Who covers any balance gets settled in writing.

The rest of the checklist covers the appraisal, the lender’s final approval, condo or homeowners association papers, a walk-through and booking settlement. Several can fall in the same week, so each gets a named owner and a reminder. Contract-to-close management explains the service in general. A buyer’s wider checklist sits on managing a home purchase in Kensington. Repair talks happen on inspection and appraisal negotiation in Kensington. Village permit offices complicate Contract to closing in Chevy Chase too. Sellers who want the listing side covered as well can reach our Kensington real estate agent by phone or email.

Where We Work

Kensington

Closing tasks change with the address. Houses within the Town of Kensington need town permit records checked for decks, fences, sheds and driveways. Historic district houses also need county work permit records for exterior changes. North and South Kensington houses need only county permit history. Condo units near Howard Avenue mostly swap that work for the association’s resale package and an elevator or loading reservation. We aim to confirm each item within ten days of ratification, because late surprises are what push closings back here.
Neighborhood Coverage

Kensington, block by block.

Serving every neighborhood across the city. Ask us about yours.

Neighborhood-level guidance comes standard: pricing, timing, and positioning tuned to the block, not just the ZIP code.

Where else to go

Keep exploring.

Everything else we publish about this service, this city, and the rest of the DMV.

Answered

Kensington, answered.

Q: What happens if a Kensington house has unpermitted work? A: Inside the town limits, building without a town permit is a Class A municipal infraction carrying a $520 fine. A buyer can inherit that problem at settlement. We request permit history from the seller and the Town of Kensington soon after ratification and resolve any gaps before closing day. Q: When must radon testing happen on a Kensington sale? A: Within the 12 months before settlement, under Montgomery County rules covering single-family houses and townhouses, and both buyer and seller receive the results. A Kensington seller holding an older test needs a fresh one, so we check the test date at ratification and book a retest promptly if needed. Q: Why do some Kensington tax bills show a front foot benefit charge? A: That line is a WSSC Water assessment tied to water and sewer mains the utility built. The charge can stay on a property’s bill for up to 30 years and may be paid off at any time. At a Kensington closing, buyer and seller decide in writing who covers what’s left.

Sources

Last reviewed October 3, 2026 by Levi Loveless, licensed in Maryland and Virginia. Every rule, rate and figure on this page links to the source we checked.

  1. Town of Kensington Code of Ordinances (amended through September 10, 2025), September 10, 2025
  2. Montgomery County Department of Finance, Real Property Taxes 2025 dataset (ZIP 20895 parcels), levy year 2025
  3. Montgomery County Code 40-13C
  4. Md. Code, Real Property 10-702(h)
  5. WSSC Water, Front Foot Benefit Charge, page modified June 26, 2026

Pull the permit history the day you ratify.

Send the ratified contract as soon as both signatures are on it. We request town and county permit records, confirm radon and inspection dates, order association documents and place each deadline on one shared calendar.